https://dl.dropboxusercontent.com/u/17111233/client3-network.sve
at 56,1258, the coal train waits to load 100% at the power station, even when the schedule does not call for that.
at 72,1144, the coal trains do not load when they should. It is as if they are both waiting for the other to finish loading
Can I check - can this be reproduced in 11.3?
I have now found and fixed both bugs in the 11.x branch.