The International Simutrans Forum

Simutrans Extended => Pak128.Britain-Ex Bug Reports => Pak128.Britain-Ex => Simutrans-Extended paksets => Pak128.Britain-Ex closed bug reports => Topic started by: fam621 on May 28, 2018, 02:33:07 PM

Title: Why is the TVM430 section board in the signalling centre for TCB* signalling?
Post by: fam621 on May 28, 2018, 02:33:07 PM
Hi James, could I briefly ask? Why is the TVM430 section board in the signalling centre for Track Circuit Signalling and if it is meant to be there why isnt the choose board not included with it?
Title: Re: Why is the TVM430 section board in the signalling centre for TCB* signalling?
Post by: jamespetts on May 28, 2018, 04:17:57 PM
Thank you for noting this. This was an error, which I have now fixed - the TVM signals should only be connected to the TVM signalling centre.
Title: Re: Why is the TVM430 section board in the signalling centre for TCB* signalling?
Post by: fam621 on June 03, 2018, 01:58:28 PM
The TVM section board is now in the Railway tools. So this bug has not been fully solved still.
Title: Re: Why is the TVM430 section board in the signalling centre for TCB* signalling?
Post by: jamespetts on June 03, 2018, 02:23:18 PM
Quote from: fam622 on June 03, 2018, 01:58:28 PM
The TVM section board is now in the Railway tools. So this bug has not been fully solved still.

I do not understand - why is it a problem that it is in the railway tools? Where else would it be?
Title: Re: Why is the TVM430 section board in the signalling centre for TCB* signalling?
Post by: fam621 on June 03, 2018, 02:48:59 PM
I mean it isnt attached to the relevant signalling centre
Title: Re: Why is the TVM430 section board in the signalling centre for TCB* signalling?
Post by: jamespetts on June 03, 2018, 03:14:07 PM
Thank you for that clarification: I believe that I have now fixed this.