The GNR 223 Class 2-4-0 (sturrock-coupled) has a maximum speed of 100 km/h. The Wilson 6ft Single's top speed is 105 km/h, while the Hawthorn Single's is 110 km/h. However, in practice, any train using these locomotives is limited to 100 km/h because they all use the GNR Early Tender which is limited to 100 km/h. This appears to be a simple oversight.
PR#143 (https://github.com/jamespetts/simutrans-pak128.britain/pull/143) makes the 2-byte change required to correct this.
Quote from: Matthew on March 24, 2023, 12:10:24 PMThe GNR 223 Class 2-4-0 (sturrock-coupled) has a maximum speed of 100 km/h. The Wilson 6ft Single's top speed is 105 km/h, while the Hawthorn Single's is 110 km/h. However, in practice, any train using these locomotives is limited to 100 km/h because they all use the GNR Early Tender which is limited to 100 km/h. This appears to be a simple oversight.
PR#143 (https://github.com/jamespetts/simutrans-pak128.britain/pull/143) makes the 2-byte change required to correct this.
Apologies for the delay in replying; I had merged this a while ago but omitted to note this on the forum. Thank you for this.
Thank you for the fix. :done: