Description of the patchThe attached patch fixes the issue that a crossing is not upgraded when the rail or the road of the crossing is upgraded.
Affected features of the patchThis patch affects construction of rails and roads.
Testing procedure- The squirrel scenario test function "test_way_road_upgrade_crossing()" was updated to check if the crossing is properly upgraded.
- The following procedure succeeded with pak64.
- Build the sand road.
- Build the 55kph rail to build a crossing.
- Upgrade the rail to the 120kph rail. Check that the speed limit for rail is 120kph, not 80kph.
Even with test case, thank you very much. Incorporated in r11016