Simutrans r11049
pak64.nippon
The specification of the bridge length in the tooltip is 1 too short for mouse tracking.
The construction price is calculated correctly for 3 fields in the picture.
tooltip_build_bridge.png
Thanks for the report, this should be fixed in r11065.
r11065 works correct
thank you