The Wooden Trestel Road Bridge in Pak128.Britain 1.07 (standard) has a maintenance cost in the .dat file of 600, as opposed to 175 for the Wooden Trestle Rail Bridge and 300 for the Masonry Road Bridge. I get the impression this cost is too high. May I suggest lowering it to 150?
Fair enough. Revised building and maintenance cost in r285