The International Simutrans Forum

Simutrans Extended => Pak128.Britain-Ex Bug Reports => Pak128.Britain-Ex => Simutrans-Extended paksets => Pak128.Britain-Ex closed bug reports => Topic started by: fam621 on December 13, 2016, 04:22:47 PM

Title: Signalboxes after 2011
Post by: fam621 on December 13, 2016, 04:22:47 PM
Also, speaking of signalboxes. I can NOT seem to build more Signalling Centre's for track circuit block signalling after 2011. :(
Title: Re: Signalboxes after 2011
Post by: jamespetts on December 13, 2016, 11:30:27 PM
I have split this topic from the thread about the reassign signals tool, as this relates to a completely different issue.

Thank you for the report: I have now amended the two ETRMS control centres so that they can work with signals in the track circuit block working method (i.e. ETRMS level 1), which should solve this issue.
Title: Re: Signalboxes after 2011
Post by: fam621 on December 17, 2016, 05:06:21 PM
I can not seams to get any track circuit block signals from either of the 2 ERTMS signalling centres on simutrans ex when I try. :(
Title: Re: Signalboxes after 2011
Post by: jamespetts on December 17, 2016, 11:13:11 PM
I cannot reproduce this with the latest build of the pakset. Are you sure that you have downloaded the latest build of the pakset?
Title: Re: Signalboxes after 2011
Post by: fam621 on December 20, 2016, 07:18:15 PM
Yes I have and it works just fine. :)