The International Simutrans Forum

 

Author Topic: Inconsistent maintenance on masonry bridges  (Read 1082 times)

0 Members and 1 Guest are viewing this topic.

Offline AP

  • Devotee
  • *
  • Posts: 1202
  • Languages: EN
Inconsistent maintenance on masonry bridges
« on: December 29, 2017, 09:49:27 AM »
I noticed that the maintenance on rail masonry bridges is, rightly, less than wooden bridges. However, for road bridges, the reverse is true, which I think is incorrect.

I believe the intention is that whilst masonry bridges are more expensive to build, the ongoing costs are much lower.

Brick rail bridges have a higher maintenance cost also, but I believe this is meant to reflect them having a higher speed limit  / the track component being better, rather than the structure.


Offline jamespetts gb

  • Simutrans-Extended project coordinator
  • Moderator
  • *
  • Posts: 18745
  • Cake baker
    • Bridgewater-Brunel
  • Languages: EN
Re: Inconsistent maintenance on masonry bridges
« Reply #1 on: December 29, 2017, 12:00:37 PM »
I will have to look into this in more detail when I deal with the balancing of costs, hopefully in the new year after some balance critical features are implemented.