News:

Use the "Forum Search"
It may help you to find anything in the forum ;).

Wooden Trestle Road bridge maintenance cost.

Started by inkelyad, September 25, 2010, 12:12:33 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

inkelyad

I think it is too big.
current 6.4Cr/km give us 9.6Cr for cheapest 3-tile bridge. It is same as 384(96km) tiles dirt road.
Because of it initial road generation newer build any bridge And prefer to route around river.

jamespetts


AvG

In my systematical approach a wooden bridge of 10 ton capacity costs 760 Cr/tile in 1750. Woodprice in 1750 = 1 Cr/ton
Maintenance 10%/year (high because wood) >> 6 Cr/month/tile (at 18-bits/month)
This is IMHO a lot but:
- 10 tons cap is a lot for a wooden bridge
- It is also more then a lot in 1750
- W.r.t. maintenance wood (in and at water) is not a very appropriate material

A 10t stone bridge cost 1580 Cr but has 3 Cr maint.

I am still thinking of a method that makes it necessary to replace a wooden bridge after ~ 50 years due to maintenance-cost (age-dependent)
AvG

inkelyad

We are talking about cheapest wooden bridge for initial road network. 3t capacity.
Alternative -- make waterway/road crossing. Like pak128 have.

AvG

In my system:
In 1750 Cost 420 Cr maint 4 Cr/m
AvG

inkelyad

AvG, can you share your version of pak128.Britain-Exp?
Even better, make fork for it on github?

AvG

I tried to use:
http://github.com/AvG/simutrans-Experimental-DRC
Have no idea how to handle this.
I lost my password booklet when moving. Tried the forgotten procedure, but do NOT understand the answer.
Github instructions are difficult for non-IT-educated people.
I you could help me here I would be very gratefull.
I will upload the bridge pak-file as an attachment.
AvG