The International Simutrans Forum

 

Author Topic: [nightlies/development] connecting ways can downgrade previous way  (Read 1170 times)

0 Members and 1 Guest are viewing this topic.

Offline captain crunch

  • *
  • Posts: 111
For some time (please apologize being vague) in the nightlies/development versions connecting ways can downgrade the previously built way.
For example lets assume a 100km/h road gets connected to a 70km/h road, then the 100km/h road gets downgraded to 70km/h at the resulting junction.
I remember this being not the case, i.e. the junction would stay being a 100km/h road.
This happens with railways too.

Offline DrSuperGood

  • Dev Team
  • Devotee
  • *
  • Posts: 2598
  • Languages: EN
Re: [nightlies/development] connecting ways can downgrade previous way
« Reply #1 on: November 14, 2015, 04:56:30 PM »
You sure you do not have a stuck key? This happens if you hold "Ctrl" when building a way since that allows you to downgrade ways.

Offline captain crunch

  • *
  • Posts: 111
Re: [nightlies/development] connecting ways can downgrade previous way
« Reply #2 on: November 14, 2015, 05:06:28 PM »
Thank you! This exactly what I did. Now can understand why this happening.

Offline Ters

  • Coder/patcher
  • Devotee
  • *
  • Posts: 5447
  • Languages: EN, NO
Re: [nightlies/development] connecting ways can downgrade previous way
« Reply #3 on: November 14, 2015, 06:49:41 PM »
That is a bit of conflicting keys. Ctrl is also used to change the auto-build strategy. It's impossible to use the alternate strategy without downgrading the ways you cross. This is unfortunate, although normally I use Ctrl to keep auto-building from routing over existing ways.