Maximum bridge weights

Started by Mariculous, May 12, 2020, 07:36:03 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Mariculous

I have no idea if current maximum bridge weights are realistic or not.
However, Sheffield tram-train is too heavy for any available road bridge and it should be possible to build road+tram bridges that can carry that load, as it is also possible to construct bridges for much heavier trains.

I have just found an image of a bridge in sheffield tram network, although I don't know if that section is part of the tram-train line or not.
https://www.thetrams.co.uk/supertram/pictures/000619/image/original.jpg

Should we adjust the maximum weight of an existing bridge e.g. steel cantilever or concrete bridge or add a new one instead?
Or is this intended and tram-train should not be able to use and road bridges at all?

jamespetts

The Tram-Train can use the concrete road bridge, introduced in 1955, which has a 70t weight limit; the Tram-Trains weigh 66t each. I have just tested this, and the Tram-Trains will pass over the bridge.
Download Simutrans-Extended.

Want to help with development? See here for things to do for coding, and here for information on how to make graphics/objects.

Follow Simutrans-Extended on Facebook.

Mariculous

The tram-train has a loaded weight of 72.16 tons.
Concrete bridges have a weight limit of 70t. A quite dangerous pitfall for any schedules.

jamespetts

Thank you for spotting that. I have now increased the maximum weight of these to 74t to avoid this problem.